Quick answer
To compare Permits results, keep input, format and settings fixed and change one variable. Area/structure/drainage may need permits/HOA.
Why it matters
Changing several variables at once makes results unattributable.
Area.
Step by step
- Check material/area/base/drainage/slope/old surface.
- Separate materials/labor/base/drainage/edging.
- Get 2-3 quotes; confirm material/base/warranty.
- Contract states scope/drainage/payment/warranty.
Common mistakes
- Unit price only, not base/drainage.
- Ignoring slope/edging/old surface.
- Not checking material/color/warranty.
- No payment/drainage terms.
Checklist
- Material/area/base/drainage/slope.
- Materials/labor/base/edging/old surface.
- Permits/HOA/drainage/color.
- Warranty/payment/contract.
- Budget/maintenance/weeds.
Key facts
- Area.
- Drainage.
- HOA.
FAQ
How do I compare two Permits results?
To compare Permits results, keep input, format and settings fixed and change one variable. Area/structure/drainage may need permits/HOA.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: ICPI